Reconstruction of two railway bridges on railway line no 47

Design documentation for two railway bridges at km 22.991 and at km 24.205 of the electrified railway line No. 47 WKD into a frame culvert made of reinforced concrete with accompanying infrastructure.
Finished
Design documentation for two railway bridges at km 22.991 and at km 24.205 of the electrified railway line No. 47 WKD into a frame culvert made of reinforced concrete with accompanying infrastructure.
Design documentation for two railway bridges at km 22.991 and at km 24.205 of the electrified railway line No. 47 WKD into a frame culvert made of reinforced concrete with accompanying infrastructure.

Property Summary

Project documentation including program and spatial concept, Construction Design, Building Permit, Executive Design, Technical Specifications for Execution and Acceptance of Construction Works, Investor's Cost Estimate.

Branches: engineering, track, road, sanitary installations, project management and technical coordination.

Property Features

  • Client: Warszawska Kolej Dojazdowa sp. z o.o.
  • Project duration: 05.2023 – 10.2024r.

Trafiklab sp. z o. o.
ul. Hoża 86/200
00-682 Warszawa

tel.: +48797767000
kontakt@trafiklab.pl

NIP: PL5223206586
KRS: 0000913101

Copyright © 2022 Trafiklab . Created by Coal Creative Interactive Agency
This site is registered on wpml.org as a development site.